Ducts optional
Heat Pump Installation in Melrose
Winter warmth and summer cooling from one machine. Specified by measurement, fitted neatly, with program forms tracked in step.
Measure First, Install Once
Most heat pump trouble starts before the install. Equipment picked off the old boiler's rating. Heads placed where they fit, not where they work. Paperwork left for later. We run it the other way around. First, the house gets measured room by room: wall type, insulation, windows, ceiling height. Out comes a heat loss number per room. Next, we choose cold-climate equipment that can carry those rooms on the coldest nights, ducted where ducts make sense, ductless where they do not, often both. Then placement. Outdoor unit location, line set route, where each head sits relative to windows and furniture. You see all of it in a written proposal, along with the price, the rebate estimate and its conditions, and the HEAT Loan amount if you plan to borrow. Install day follows the plan. Floors covered. Lines dressed neatly. Thermostats wired. The outgoing equipment dealt with per the agreement. Then commissioning in both modes, a hands-on tour of the thermostats, and the incentive and loan paperwork finished at your table. One visit to measure. One install. No callbacks for undersized rooms. A note on Melrose houses specifically. Victorian parlors with eleven-foot ceilings, enclosed sleeping porches, kitchens added in three different decades. Each of those spaces loses heat at its own rate, and each gets its own line on the heat loss sheet. That sheet becomes part of your file, so if anyone asks later why a room got the head it did, the answer is on paper.
Included in Every Install
The list does not change much from house to house.
Heat loss count
Each room measured. Equipment sized to the result.
Cold-climate units
Equipment that qualifies for Mass Save incentives and keeps heating in deep cold.
Placement plan
Outdoor unit, heads and line sets mapped before day one.
Neat line sets
Run along the exterior in covers or through closets. Wall penetrations sealed.
Ducted where it fits
Attic or basement air handlers when short duct runs can serve several rooms.
Controls set up
Thermostats or remotes configured. Integrated controls if backup heat stays.
Two-mode testing
Every zone run in heating and cooling before handover.
Forms completed
Incentive and loan paperwork finished with you once the system is commissioned.
Install Sequence
Measure
A walk through every floor. Insulation, windows, electrical panel and existing heat noted. You tell us what bothers you about the current system.
Propose
Equipment, placements, price, rebate estimate with conditions and any loan amount, in writing. Questions answered before you sign anything.
Install and close out
Hardware hung. Tubing dressed. Thermostats live. Outgoing equipment dealt with. Then testing, a tour of the controls and the paperwork.
Why Melrose Owners Call Us
Seven years installing heat pumps
Seven years in business converting older homes. We know where the shortcuts lead.
Covered after we leave
Our installation carries a 10-year workmanship warranty, in writing.
One file, fully tracked
Equipment, rebate and loan move together, so nothing is left hanging after install day.
- 7 years installing
- 10-year workmanship warranty
- Sized by measurement
- Paperwork filed
Thinking About a Heat Pump This Year?
Give us the basics: house, fuel, utility. We will say whether it fits and what the programs could cover.